You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kali Maja Sudah 50 Persen

Mud Dredging in Maja River Has Touched 50 Percent

It has been ongoing since August and aims to minimize inundation in Kalideres area

The mud dredging process in Maja River, Pegadungan, Kalideres, West Jakarta has reached 50 percent. It is carried out from Jalan Peta Utara up to Bambu Larangan and targeted to be complete in October.

"It has been ongoing since August and aims to minimize inundation in Kalideres area," expressed West Jakarta Water Resources Sub-agency's Raw, Clean and Waste Flood Waters Control Maintenance Head, Imam Prasetyo, Wednesday (9/25).

Kepu Selatan Channel Dredging Targeted to Be Complete in October

It is carried out up to 1,050 meters length with 1-1.5 meters depth.

"To do it, we have deployed amphibian and spider excavators plus 10 dumb trucks and 15 personnel to the location," he closed.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1287 personBudhi Firmansyah Surapati
  2. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  3. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye671 personBudhi Firmansyah Surapati
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye606 personAldi Geri Lumban Tobing
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye525 personAldi Geri Lumban Tobing